Speikboden, new “Bernhard Glück” chairlift featuring the ROPERA® standard

Speikboden, nuova seggiovia “Bernhard Glück” a sei posti
Photo information

LEITNER - Speikboden AG-SpA

South TyrolNEW LIFTS

Speikboden, new “Bernhard Glück” chairlift featuring the ROPERA® standard

For the 2025/2026 winter season, the new six-seater detachable "Bernhard Glück" chairlift is scheduled to open, replacing the previous four-seater chairlift after 29 years of service.

At the Speikboden ski area in the Ahrntal Valley, construction work on the new lift is progressing according to plan: the construction work is being carried out by Gasser Markus of Sand in Taufers, while the lift technology is being supplied by Leitner.

The chairlift will be much more comfortable and quieter, featuring ergonomic seats with integrated heating and protective bubbles against wind and snow.  Thanks to the new loading area with a loading conveyor and integrated lifting platform, children and beginners will also be able to board safely and comfortably. Once the safety bar has been lowered, it remains locked for the entire ride, effectively preventing passengers from accidentally falling. At the top station, the bar opens automatically.

The new “Glück” chairlift is the world’s first lift equipped with Leitner’s brand-new ROPERA® technology, which delivers the highest standards in performance, sustainability, flexibility, quietness, workplace safety and ease of maintenance across all components. Operating data is recorded, monitored and documented digitally in real time. Reminders for inspection intervals, simple navigation and clear displays: all this saves time, reduces sources of error and increases safety in daily operations. Thanks to its well-considered design, the new lift also provides ample space for staff, ensuring greater comfort at work.

Technical data for the new “Bernhard Glück” chairlift

•        Speed: 5 m/sec

•        Diagonal length: 1,200m

•        Maximum transport capacity: 2,400 people/hour

•        Lower and upper station altitude: 1,820 metres – 2,180 metres

•        Ride time: 4:10 min

© ALL RIGHTS RESERVED
20
Social media engagement

Most read in Regioni

Passo dello Stelvio: the new Geister 1 and 2 ski lifts open today

Passo dello Stelvio: the new Geister 1 and 2 ski lifts open today

After more than three years of waiting and a challenging construction project on the glacier, the two ski lifts replacing the previous installation, which operated until July 2023, opened today. The opening of the slopes and lifts at Passo dello Stelvio is currently scheduled through 1 November.